Tuesday, October 28, 2008

Stairs, Windows & Doors

We added 2" of insulation to the north
and south sides and sealed the cracks
with foam. The east and west sides
will be covered with 16" of cellulose.

A view from inside.

There they are, our "his and hers" skylights.

And Shawn installs it.

Dustin carries the new skylight up.

After looking at our newly-installed skylight above
the stairway, we decided to add another.
Shawn prepares the roof in this pic.

It's in!

Craig checks to make sure that it fits properly.

Up it goes with the transom in place.

The whole crew arrives to install the door.

First, a treated rim board is attached. It will support our deck.

It took a while for some "mulling" materials to arrive,
but now our french door can be installed

The windows are now (mostly) in.

He gets some help from his crew for the
bedroom window.

Craig installs our bathroom window.

Our front door, on the right, remains in the
warehouse for protection. A smaller exterior door
from the old house will be used during construction.

Living room french door.

And installs it.

Steve carries the skylight up...

Our dining room window.

Finished, but with temporary treads.

And now the stairs.

Steve begins building the landing.

Back to Most Recent Photos

No comments: